Existing Street Pulverized
With Soil |
Existing Street Pulverized |
Half the street Pulverized |
Spreading Envirolime |
Mixing at 12" Depth |
Mixing and Maintaining
Traffic |
Graded and Compacted |
Adding More Water |
Spreading Material
Directly on Asphalt |
Existing Street
Completed |
Paving Completed |
Click on any of the pictures
below to view a larger version and progress through the Photo
Album for the Project of interest.
Prospect
Drive, Frederick County, MD |
| Full
Depth Reclamation with Enviro Lime (Quick Lime) |
| Mix
4" to 6" Hotmix Asphalt with approximately 6"
of Soil and Clay. Added 3% Envirolime and overlayed roadway
with 3.5" of Hotmix. |
Click on any of the pictures
below to view a larger version and progress through the Photo
Album for the Project of interest.
Manchester
Township, York PA |
Full
Depth Reclamation (FDR) |
| Took
an existing roadway with 4" to 5" Chipseal &
hotmix, added 3" to 4" 3A Modified, and placed
new overlay of 2.5" Binder and 1.5" Wearing. |
Click on any of the pictures
below to view a larger version and progress through the Photo
Album for the Project of interest.
Lucent
MW Manufacturing Superfund Site, Danville PA |
Environmental
/ Soil Stabilization |
| Mixed
16" of soil to Flyash, 6" Fluff (insulation
from phone wire), and 10% Slurry Cement at 1 lb Portland
to 1 gallon water. |
Site Sign |
Overview of Batch Plant |
Water Filtration System |
Air Quality Monitor |
Fly Ash Stockpile |
Dumping Soil |
Adding Fly Ash to Soil |
Fluff Stockpile |
Fluff - Insulation from phone wires |
Adding Fluff to Fly Ash and Soil |
Special Air Carbon Filtering System |
Mixing |
Mixing |
Cement being disc'd into soil |
Reclaimer mixing at a depth of 22" |
Mixing and Grading |
Compacting |
Click on any of the pictures
below to view a larger version and progress through the Photo
Album for the Project of interest.
Natural
Soils Products, Tremont PA |
Environmental
/ Soil Stabilization / Composting Pads |
| Mixing 5% Flyash to 5% Portland Cement
and 8" of blended aggregate. |
Existing Composting Pad |

Aggregate on Pad |
Flyash being added to aggregate |
Flyash |
Laying Portland Cement and Mix |
Mixing with water and checking density |

Spreading |
Spreading |
Spreading Grading and Compacting |
Overview of Project |
Curing |
|